PORTFOLIO
Dublin Airport T1
As Part Of The Upgrade Of The Busy Departures Road At Terminal 1
Client: Dublin Airport Authority
Location: Dublin, Ireland
Surface Area: Departures Area Public
Completed: 2015
Architect: Knights Group Limited
Abell & Cleland Westminster
Protect IT 100 Was Used To PreSeal Precast GRC Panels By Techrete UK
Client: Berkeley Homes
Location: Westminster, London
Surface Area: Precast GRC Panels
Completed: 2015
Architect: DSHDA
N6 Motorway
Protect IT 100 Is Specified For All Bridge Protection For Transport For Ireland
Client: Transport for Ireland
Location: Dublin-Gaway, Ireland
Surface Area: Bridges - Horizontal & Vertical
Completed: 2009
Architect: Roadbridge Limited
CrossRail Paddington
New Paddington Station With Crossrail UK Implementing Protect IT 100 Impregnation Sealer.
Client: Crossrail UK
Location: London, UK
Surface Area: Horizontal & Vertical Panels
Completed: 2015
Architect: Costain & Macrete
Luas Line Dublin
Protect IT 100 Reduces Future OnGoing Maintenance Time & Costs Up To 80%
Client: Sisk Steconfer Joint Venture
Location: Dublin Ireland
Surface Area: Horizontal Platforms
Completed: 2016
Architect: Sisk & Sons Limited
Westfield London
Protect IT 100 Reduces Future OnGoing Maintenance Time & Costs Up To 80%
Client: Westfield London
Location: London, UK
Surface Area: Horizontal Panels
Completed: 2015
Architect: Techrete UK Limited
Mersey Gateway
Protect IT 100 Provides Long-Term Surface Sustainability For Bridge Surfaces As Specified By Transport.
Client: The Mersey Gateway Environmental Trust
Location: Halton, North Chesire UK
Surface Area: Bridge Surfaces
Completed: 2016
Architect: Shay Murtagh Precast Concrete
Grafton Street
The pedestrianised Grafton St was cleaned & sealed using ProtectiT solutions.
Client: Dublin City Council
Location: Dublin, Ireland
Surface Area: Grafton St
Completed: 2015
Upper St London
ProtectiT Impregnation Sealers were applied to both internal & external surface of this stand-out building.
Client: Amin Taha
Location: Upper St London
Surface Area: External & Internal
Completed: 2017
Architect: Amin Taha